Loading Dock and Door Update – Ottawa Warehouse
Kim Sokolowski2024-09-20T16:18:27-04:00We updated the dock leveler, overhead door and man/passage door at this Ottawa warehouse in prep for a new tenant.
We updated the dock leveler, overhead door and man/passage door at this Ottawa warehouse in prep for a new tenant.
This Burnaby warehouse needed to up upgrade their worn-out dock with a Blue Giant hydraulic leveler for a trouble-free operation.
There was no loading dock at Coveted Cakes new location. We constructed a new dock pit and added a dock leveler, bumpers and wheel chock.
As part of their expansion, we added two new loading dock positions and doors to this Brampton food facility.
Anthem Properties upgraded their rental property with new hydraulic dock levelers, dock bumpers, dock seals and polycarbonate door sections.
We removed the dangerous mechanical dock leveler and replaced it with a safer hydraulic dock leveler completed with steel face dock bumpers.
We replaced 75 heavy-duty hydraulic dock levelers at this busy facility to improve safety for their 3-wheel forklifts.
We supplied and replaced this old dock leveler with a new hydraulic dock leveler within 7 weeks. It was protected with new steel face dock bumpers.
This busy Whitby warehouse needs a new position complete with insulated rolling steel door, hydraulic dock, truck lock and dock seal.
We replaced the old dock levelers, trailer restraints and dock seals with new easier to operate hydraulic ones and a tight seal.
In order to keep up the expanding business, this Port Hope manufacturing plant needed three new loading dock positions.
We replaced the 10-year-old rolling doors with low-maintenance rubber doors to improve safety at this Calgary manufacturing plant.
