A Customer Success Story from Northern Dock Systems

Download Success Story

Project Overview

Northern Dock Systems Construction and Design team was awarded the project for the new addition and renovation at Brantford Power.

Our Equipment Installation team installed new sectional overhead doors with windows to let in national light in their facility. Meanwhile, inside we installed both rolling steel fire doors and rolling steel service doors to improve safety and security in the new addition. Furthermore to increase energy savings and their ROI, our installation team added air curtains to their drive-in doors to keep heating warm air inside during the winter and cool inside during the summer.

Contractor: Ball Construction
Architect: SRM Architects
Equipment Provided: Wayne Dalton TS200-20 Sectional Overhead Doors, Cookson ERD10 Rolling Steel Fire Doors, Wayne Dalton Model 924 Rolling Steel Service Door, Enershield XS-240 Air Curtain Barriers

Location:

Brantford, Ontario

Featured Services:

 
Download Success Story
Local Grocery Store – Lift Table Replacement
Custan Foods - Dock and Door Preventive Maintenance